HPE0-S52 Exam Questions Are Out - Download And Prepare [April 2018 Dumps]

practictests

PracticTests offers you valid HPE ATP - Server Solutions HPE0-S52 exam practice test software and HPE0-S52 exam pdf files. All HPE0-S52 dumps consits of updated and valid HPE ATP Server Solutions V4 HPE0-S52 exam Questions and answers. All HPE0-S52 exam Questions are verified by experts. Once you have completely prepared with our HPE ATP Server Solutions V4HPE0-S52 exam dumps you will be ready for the actual HPE0-S52 exam without any problem. Try free demo of HPE0-S52 exam before purchase.
 

♥ 2018 VALID HPE0-S52 Exam Questions ♥

Free Download NEW HPE0-S52 Exam Dumps (PDF and Practice test software):
Available on: https://www.dumps4it.com/HPE0-S52-dumps.html

Latest HPE0-S52 Dumps Exam Questions and Answers:

Version: 8.0
Question: 46


How does the HPE c7000 BladeSystems use of network infrastructure compare with the HPE Apollo 6000’s?
 
A. The HPE c7000 BladeSystem offers less port variety.
B. The HPE c7000 BladeSystem offers greater port consolidation.
C. The HPE Apollo 6000 offers greater per server connectivity.
D. The HPE Apollo 6000 uses fewer network ports per server.
 
Answer: A 
Question: 47

 
View the Exhibit.
Refer to the exhibit. An architect is planning an HPE Moonshot System with m710 cartridges to support a customer application virtualization solution. The customer indicated that the maximum acceptable response time for the solution is three seconds. The architect has implemented a POC
and tested a single cartridge with different numbers of user sessions.
The architect monitored resource utilization throughout the tests. The results of the test with the point at which the response time exceeded three seconds are shown, marked as the "VSI max."
What should the architect conclude from this test?
 
A. CPU becomes a limiting factor around 50 sessions, so the architect should propose at least one cartridge per 45 or 50 users.
B. None of the monitored resources shows signs of being a bottleneck, so the architect should consider other factors such as the HPE Moonshot switch module.
C. The network adapter becomes a bottleneck before other resources, so the architect should propose m710pcartridges, which provide 10GbE ports.
D. The memory becomes a bottleneck before other resources, so the architect should propose m400cartridges, which provide a higher memory capacity.
 
Answer: C 
Question: 48

 
During a data center transformation discussion, an architect obtains the following customer information:
core business depends heavily on advanced data modelling techniques that has been developed internally
infrastructure in use takes anywhere from 10 hours to five days to complete complex data models for the various development teams that rely on them
has a proud reputation as an "environmentally friendly" Fortune 500 company
increasing productivity of its development team is the highest priority
Which large scale HPC solution should the architect recommend to help the customer achieve its transformation goals?
 
A. HPE Apollo 8000
B. HPE Integrity Superdome X
C. HPE Apollo2000
D. HPE Apollo 6000
 
Answer: C 
Question: 49

 
An architect explains a software-defined data center (SDDC) concept and its benefits to a customer. The customer indicates an interest and so the architect needs to verify whether the customer is ready to move to the SDDC.
Which additional information should the architect obtain from the customer to verily this?
 
A. whether they already virtualize compute and storage resources
B. whether they have a disaster recovery plan implemented
C. whether they have standardized on a single vendor
D. whether they have a workplace mobility plan implemented
 
Answer: A 
Question: 50

 
An architect reviews an HPE Apollo 6000 design and finds that there are plans for redundant iLO connections on each HPE Apollo 6000 chassis to a pair of top-of-rack switches. These switches are set up as individual switches connected to a single core.
Which configuration change should the architect recommend to ensure a loop free management topology?
 
A. Remove one iLO connection from each HPE Apollo 6000 chassis.
B. Configure MAD between the top-of-rack switches.
C. Replace the top-of-rack switches with HPE Advanced Power Management Kits.
D. Configure IRF between the top-of-rack switches.
 
Answer: D